Technical Guides

How to Prepare an Instrumentation RFQ for an Industrial Project

A practical overview of the information suppliers need to prepare accurate instrumentation quotations.

Category
Project Procurement
Applies to
Instrument indexes, datasheets, BOM and MTO
Outcome
Fewer clarification rounds and comparable offers
Related service
Equipment Selection Support

Why RFQ Completeness Matters

An instrumentation RFQ should identify the measurement duty, required configuration and commercial scope for each line item. Separate mandatory requirements from preferences, and mark missing information rather than asking suppliers to assume process conditions.

Minimum Data by Instrument Type

Instrument typeRequired information
PressureMedium, range, process connection, materials, approvals
TemperatureSensor type, range, thermowell, insertion length, approvals
LevelMedium, tank data, range, process connection, approvals
FlowMedium, flow range, line size, pressure, temperature, accuracy
AnalyzersMeasured component, range, sample conditions, standards

General Commercial Information

  • Project name and reference
  • Approved manufacturer list
  • Required documentation
  • Inspection and testing requirements
  • Delivery destination and Incoterms
  • Required delivery date

Ask for Comparable Offers

  • Use the same tag numbers, quantities and document revisions for each supplier.
  • Ask suppliers to identify offered models, configuration codes and accessories line by line.
  • Require a separate list of deviations, exclusions and unanswered technical questions.
  • List required certificates, calibration documents and manuals as explicit deliverables.
  • Distinguish requested delivery dates from supplier-quoted lead times and shipment terms.

Download an RFQ Preparation Template

Use the plain-text worksheet to collect project details and instrument requirements before submitting your datasheets or BOM. Repeat the item section for each instrument. The worksheet is a preparation aid; application-specific datasheets may require additional fields.

Example of a Clarification to Resolve

If a request says only “pressure transmitter, 0–10 bar,” ask whether the duty requires gauge, absolute or differential pressure. Confirm the medium, process connection, materials, operating conditions, output and approvals before treating quotations as equivalent. This is an illustrative RFQ example, not a completed ADRIIX project.

Frequently Asked Questions

Can I submit an incomplete specification?

Yes. We review the available information and identify missing details before sourcing.

Which file formats are accepted?

PDF, Excel, Word, CSV and ZIP archives.

Need Help With Equipment Selection?

Send us your technical specifications, equipment list or preliminary procurement requirements. We will review the scope and advise on the next steps.